Gallery » Danzig Report 108 - July, August, September 2000 » Track Layouts
[« Previous]
[Next »]
Track Layouts
Figure 7- (Left) Tracks from the Oirschau line from the south, enter the city, pass the Hbhf., then head to the northwest. Afte the main line was completed in 19(X), the Legetor was of little use.
(Right) The area of the Hauptbahnhof on the Stadtgraben on the east, with the Promenade bordering the area on the west. Suburban trains stop at the dead-end at the north end of the main building The postal buildingis designated b, just south of the main building.
Danzig Report Vol. 1 - Nr. 108 - July - August - September - 2000, Page 21.
Hits: 2341
Added: 28/07/2015
Copyright: 2024 Danzig.org
[« Previous]
[Next »]